Increased potential supports study expansion to 2Mtpa for $96m+ Pilbara gold project, design and costing near complete


The scale of a proposed gold project in the Pilbara has been expanded to a 2Mtpa plant throughput in a study nearing completi...


To read the rest of this article, please log in using the form below, or sign up for a free 21-day trial and explore our full range of insights.

Log In