Optimum mining, processing and road haulage rate of 1.25Mtpa to form basis of feasibility study for hematite project in Mid West, ore shipped from Geraldton


A feasibility study on a hematite project in WA's Mid West is on track for completion in October with the proponent announcin...


To read the rest of this article, please log in using the form below, or sign up for a free trial and explore our full range of insights. Your free trial runs for 21 days or 100 page views, whichever comes first.

Log In