Capital costs of $70m for proposed 1Mtpa open pit gold project south west of WA


A recent scoping study on a proposed open pit gold project south west of WA envisages a total capital cost of $70m including...


To read the rest of this article, please log in using the form below, or sign up for a free trial and explore our full range of insights. Your free trial runs for 21 days or 100 page views, whichever comes first.

Log In